BOM.csv
Create BOM.csv
As requested, I added BOM.csv in the root of my github repo. The BOM is based on BOM.md but in a .csv foramte.

| BOM.csv | BOM.csv in GitHub |
|---|---|
![]() |
![]() |
Timeline
Start: 06-March-2026 | 12:45 AM
End: 06-March-2026 | 2:00 AM
Journal Entry Written: 06-March-2026 | 2:05 AM
It took me about an hour to create
BOM.csv. I'll be honest, I struggle when it comes to writting a.csvfiles !!!
PenguinMo
requested changes for EntPad ago
Hi, your key is looking cool please add your BOM to the repository and check https://blueprint.hackclub.com/about/submission-guidelines before submitting again , it might seem like a lot but you can do it!
lasipK
submitted EntPad for review ago
lasipK
added to the journal ago
Firmware
Firmware
Done with firmware. It was so fun writting the firmware. Ezzz!!!
Timeline
Start: 24-Feb 2026 | 1:30 AM
End: 24-Feb 2026 | 1:40 AM
Journal Entry Written: 24-Feb 2026 | 1:45 AM

lasipK
added to the journal ago
CAD
CASE
Done designing my case in Fusion 360. The Only time taking part was only the Keycap, as i'm not that good with 3D modeling, in my past two projects i struggled alot with the Bottom Case and plate of my project case: took me days completing them, but in this project i was very fimilior with the modeling that this project modeling was done in no time, only time taking part was the Keycap as me as my brain was not braning. but some how i managed and completing it as well.
Rendering are aslo done and are provided at the end before Timeline section.
I'm very satisfied with the renders, really looking forword to this project completion.
Next step is to write the Firmware and BOM then I'll verify everything once again then submite it for approvel.
Timeline
Start: 18-Feb 2026 | 1PM
End: 23-Feb 2026 | 4PM
Jornal Entry Written: 24-Feb 2026 | 1AM
| Bottom | Plate | Keycap_Bottom | Keycap_UP | Full-CAD |
|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
Open Images in new Tab for clear view, Or visit Renders Folder in project REPO to View each more efficently!
lasipK
added to the journal ago
EntPad_Planning
Plannign_Phase
This pad will be handwired. A custom PCB will not be designed for two primary reasons:
A 100×100 mm PCB costs approximately $16–$20 including shipping. For a simple 3×3 pad, this cost is disproportionate to the project’s complexity.
The circuit is straightforward and does not justify PCB fabrication. The pad consists of only a few components and does not require dense routing or multilayer design.
Given the minimal electrical complexity, handwiring is more economical and appropriate.
Design Overview
- Layout: 3×3 key matrix
KeyMap:
[ KC.NO, KC.NO, KC.NO,
KC.NO, KC.ENT, KC.NO,
KC.NO, KC.NO, KC.NO, ]Wiring: Handwired matrix with per-switch diode
Firmware: KMK Firmware
Timeline
- Project Started: 17 Feb 2026 — 10:00 PM
- Planning Started: 18 Feb 2026 — 11:30 AM
- Planning Completed: 18 Feb 2026 — 12:00 PM
- Journal Entry Written: 18 Feb 2026 — 12:00 PM

lasipK
started EntPad ago
2/18/2026 - EntPad_Planning
Plannign_Phase
This pad will be handwired. A custom PCB will not be designed for two primary reasons:
A 100×100 mm PCB costs approximately $16–$20 including shipping. For a simple 3×3 pad, this cost is disproportionate to the project’s complexity.
The circuit is straightforward and does not justify PCB fabrication. The pad consists of only a few components and does not require dense routing or multilayer design.
Given the minimal electrical complexity, handwiring is more economical and appropriate.
Design Overview
- Layout: 3×3 key matrix
KeyMap:
[ KC.NO, KC.NO, KC.NO,
KC.NO, KC.ENT, KC.NO,
KC.NO, KC.NO, KC.NO, ]Wiring: Handwired matrix with per-switch diode
Firmware: KMK Firmware
Timeline
- Project Started: 17 Feb 2026 — 10:00 PM
- Planning Started: 18 Feb 2026 — 11:30 AM
- Planning Completed: 18 Feb 2026 — 12:00 PM
- Journal Entry Written: 18 Feb 2026 — 12:00 PM

2/24/2026 1:19 AM - CAD
CASE
Done designing my case in Fusion 360. The Only time taking part was only the Keycap, as i'm not that good with 3D modeling, in my past two projects i struggled alot with the Bottom Case and plate of my project case: took me days completing them, but in this project i was very fimilior with the modeling that this project modeling was done in no time, only time taking part was the Keycap as me as my brain was not braning. but some how i managed and completing it as well.
Rendering are aslo done and are provided at the end before Timeline section.
I'm very satisfied with the renders, really looking forword to this project completion.
Next step is to write the Firmware and BOM then I'll verify everything once again then submite it for approvel.
Timeline
Start: 18-Feb 2026 | 1PM
End: 23-Feb 2026 | 4PM
Jornal Entry Written: 24-Feb 2026 | 1AM
| Bottom | Plate | Keycap_Bottom | Keycap_UP | Full-CAD |
|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
Open Images in new Tab for clear view, Or visit Renders Folder in project REPO to View each more efficently!
2/24/2026 1:47 AM - Firmware
Firmware
Done with firmware. It was so fun writting the firmware. Ezzz!!!
Timeline
Start: 24-Feb 2026 | 1:30 AM
End: 24-Feb 2026 | 1:40 AM
Journal Entry Written: 24-Feb 2026 | 1:45 AM

2/24/2026 5 PM - BOM
BOM
Finished the BOM, i've made sure that the links are accurate and also organized all the Cart Screenshots in the BOM folder.

Timeline
Start: 24-Feb 2026 | 2 AM
End: 24-Feb 2026 | 3 PM
Journal Entry Written: 24-Feb 2026 | 5:55 PM
3/6/2026 - BOM.csv
Create BOM.csv
As requested, I added BOM.csv in the root of my github repo. The BOM is based on BOM.md but in a .csv foramte.

| BOM.csv | BOM.csv in GitHub |
|---|---|
![]() |
![]() |
Timeline
Start: 06-March-2026 | 12:45 AM
End: 06-March-2026 | 2:00 AM
Journal Entry Written: 06-March-2026 | 2:05 AM
It took me about an hour to create